TM 10-5410-229-13&P
2-9. PREPARATION FOR MOVEMENT- Contd
(e)
Remove the telescopic poles (6) at entrance way by pushing up on the locking device (7). Collapse
poles and place them in the frame transport bag.
(f)
Remove steel pins (8) from entrance way wall (9) and place in tent pin container.
(g)
Close and secure left (10) and right (11) blackout doors and outer blackout doors (12) on end wall
assembly (13).
(h)
Remove all liner assemblies (14). Release all quick disconnect (3) and hook and pile fasteners (4).
Fold each liner with identification label visible and place in fabric transport bag.
(i)
Release quick disconnect fasteners (15) connecting the floor (16) to the walls. Remove and fold floor
(16) with identification label visible and place in fabric transport bag.
(j)
Remove walls by releasing all quick disconnect (3) and hook and pile fasteners (4). Fold the wall
assemblies with identification labels visible and place in fabric transport bag.
(k)
Release the remaining quick disconnect fasteners (17) holding the roof cap (18) to the frame assembly
(19).
(5)
Collapsing the Frame Legs.
2-48