TM 10-5410-229-13&P2-9. PREPARATION FOR MOVEMENT.To prepare the MCPS for movement, follow the procedures outlined inparagraphs a and b below. As time and circumstances allow, perform operator PMCS "After" services. Clean and dry tentfabric sections and equipment as described in paragraph 3-5. Package the tent into the transport bags as described inparagraph b below.a.Takedownprocedures.First, locate the three transport bags and the light set storage container, then proceed asfollows:(1)Table.Unlock the hinges by pressing the center in towards the table top. Fold the legs of the table intowards the center and remove from tent.(2)Mapboards.Lift the mapboards (1) off the equipment straps (2) and pull the sections apart by lifting the tab over thebutton at the center edge of each mapboard section (1) and sliding the mapboards apart. Removemapboards from tent. Remove straps and store in tent pin container.(3)Luminaires.Unplug the power source cord from the luminaires. Do not remove the luminaires until theframe assembly has been lowered. See paragraph (5) (d) below.2-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business