TM 10-5410-229-13&P
2-6. ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd
NOTE
If the MCPS is to be heated with a space heater, locate the stove pipe
opening towards the plain wall end of the tent.
(4)
Stretch the corners of the roof cap (1) over the corners of an end wall frame assembly (2). Repeat steps 3
and 4 with the other half of the roof cap (1). Open stove pipe opening (3) if desired.
d.
Unfoldinq the frame leqs. To unfold the legs on the end and center wall frame assemblies proceed as follows:
(1)
Choose one of the sides with three legs (1). Lift the frame assembly up at the two corners and rotate the legs
(1) out until they stop. Lock the legs (1) into position by engaging the teeth and turning the handles (2) on the
end wall fittings (3) downwards until tight. Repeat this procedure with the legs (1) on the center wall frame
assembly.
2-20