TM 10-5410-221-24
1
Bolt (5)
21
Cover assembly
41
Detent pin
2
Washer (5)
22
Cover assembly
42
Screw
3
Cover assembly
28
Screw (24)
43
Screw
4
Rivet (5)
24
Cover assembly
44
Washer
5
Hinge
25
Rivnut (16)
45
Ground rod
6
Gasket
26
Screw (6)
46
Rivet (4)
7
Gasket
27
Washer (6)
47
Seal angle (2)
8
Gasket
28
Towing bracket (4)
48
Guard
9
Pin
29
Blind nut (6)
49
Guard
10
Fastener stud
30
Screw (6
50
Bolt (38)
11
Bolt (13)
31
Washer (6)
51
Washer (88)
12
Washer (13)
32
Washer (6)
52
Skid assembly (2)
13
Bulkhead assembly
83
Mobilizer bracket (4)
63
Bolt (22)
14
Bulkhead assembly
34
Channel insert
54
Channel (2)
15
Seal
35
Bolt (8)
55
Rivet (44)
16
Screw (58)
36
Washer (8)
56
Nut plate (22)
17
Screw (12)
3
Washer (8)
57
18
Cover assembly
38
Support assembly
58
Panel assembly, fixed floor
19
Cover assembly
39
Spacer
20
Cover assembly
40
Blind nut
Figure 10-12 - Continued.
Section III. SHELTER BODY ASSEMBLY OVERHAUL
colors to be used on all surfaces to be painted.
General
b. Surface Preparation. The surface preparation
shall be in accordance with MIL-T-704.
This section provides information necessary for the
overhaul of shelter body assembly. Sea assemblies are
c. Exterior Surfaces.
Exterior surfaces and
to be removed and replaced o a yearly basis. The
components shall be primed with one coat Epoxy Primer,
shelter interior and exterior shall be painted on a yearly
or equivalent (catalyze per manufacturers instructions).
basis.
Air dry 18 hours or 30 minutes at 1500 to 3000F. Dry
film thickness shall be 0.3 to 0.4 mil. Apply two finish
Panel Assemblies Overhaul
coats of Specification TT-E-527 enamel (catalyze per
manufacturer's instructions). Air dry 18 hours or 30
Overhaul of the panel assemblies shall consist of a
minutes at 1500 to 3000F. Dry film thickness shall be
complete inspection for corrosion dents, scratches,
1.2 +0.2 mils per coat. Color match per Federal
nicks, or other surface irregularities. Use emery cloth to
Standard 595 No. 34087.
dress to a smooth surface all nicks, cuts, corrosion and
scratches Minor dents are acceptable. Cuts through the
d. Interior Surfaces. Interior walls shall be primed
aluminum facing or large dents shall be repaired in
with one coat of Epoxy Primer, or equivalent (catalyze
per manufacturer's instructions). Air dry 18 hours or 30
minutes at 1500 to 3000F. Dry film thickness to be 0.3 to
0.4 mil. Apply two finish coats Epoxy Base, Semi-Gloss
Green (catalyzer per manufacturer's instructions). Air
10-17.
Seal Replacement
dry 18 hours or 30 minutes at 1500 to 3000F. Dry film to
be 1.2
+0.2 mils per coat. Color match per Federal
Replace seal assemblies as outlined in pane
Standard 595 No. 24516.
Shelter Painting
a. General. This procedure defines the surface
preparation, type of primer, paint, and
.