TM9-2330-390-14&P
2-9. ATTACHING FRONT AND REAR DOLLIES TO SHELTER (Cont).
n.
At front and rear, install two twist locks (13) to top beams (2) and shelter (6). Rotatetwist locks 90° so that
twist lock pins (12) are horizontal. Tighten nuts (10) finger-tight.
o.
At front and rear, pull down on two lift cylinder levers (1) to ensure that top beam (2) Is flush against
shelter (6).
p.
At front and rear, pull down on positioning cylinders lever (8) to raise top beam (2) to force heads of twist
locks (13) up against top on inside of corner blocks (9). Use twist lock wrench (Item 3, Appendix D) to tighten nuts
(10).
q.
Check all twist locks (13) at top and bottom beams (2 and 5). Twist lock pins (12) must be horizontal.
Tighten nuts (10) as required. Install safety pins (11) through twist locks to secure nuts.
r.
Remove stowage strap (16) from each transportation lockout (14) and top beam vertical tube (15).
2-62