TM 10-8340-225-10
2-17.
EQUIPMENT-CONT.
b.
Map Board. Install the map board as follows:
(1)
Open the map board to its full width. Slide the collar as far as possible. The locking pin will halt the sliding
action and lock the map board in place. There are two collars.
(2)
Suspend the map board from the eave of the tent frame.
c.
Table. The legs on the table fold for ease of storage, to release the legs, unfold them to an upright position. The
legs will automatically lock into place at their upright position.
2-18.
STRIKING PROCEDURES. Disassembly of the Standardized Integrated Command Post System is
essentially the reverse of set-up. Before beginning, locate the three tent transport bags and the light set container.
2-25