TM 10-8340-225-10
2-16.
PRIVACY CURTAIN ASSEMBLY-CONT.
determined by proper alignment of the liner door with desired position of walkway between tents.
b.
Open the liner door. Unfasten the velcro across the top and down the side of the liner door and roll the door
from left to right so that a vertical roll is formed. Three sets of straps with buckles are provided to secure the vertical
roll at its top, middle and bottom.
2-17. EQUIPMENT. The other major components for the Standardized Integrated Command Post System are a light
set, two light weight map boards and two light weight tables. Once the tent is fully erected, the additional components of
the Standardized Integrated Command Post System may be carried in through the entrance way/vestibule opening.
a.
Tight Set. Install the light set as follows:
NOTE
To prevent damage leave lights in case until ready to install.
NOTE
Leave male plug end available for connection to power source.
2-23