2-4. ABBREVIATED SET-UP INSTRUCTIONS-CONT.
i.
Secure the tent wall corners.
j.
Extend and stake the entrance vestibule.
k.
Install the floor.
l.
Install the liners.
m.
Interconnect adjoining tents.
n.
Install privacy curtains, if desired.
2-5. DETAILED SET-UP PROCEDURES. The following instructions are for those who are not experienced erecting the
Standardized Integrated Command Post System.
2-6. UNPACKING AND INSPECTION . All tent components and the light set are packaged in reusable shipping
containers. Unpack transport bags and visually inspect their contents for the correct quantities, as listed in Appendix B,
Components of End Item and Basic Issue Items. Also refer to Table 2-2, Operator PMCS, for inspection procedures.
Store containers for future use.
CAUTION
Do not step on tent components. Damage can result.
2-7. SITE SELECTION. When selecting a site to locate the Standardized Integrated Command Post Shelter Tent, the
following characteristics are preferable:
a.
Level area.
b.
Clear of all rocks and underbrush.
c.
Sheltered from high winds.
d.
Prepared for good drainage.
2-10