TM 10-8340-225-10Table 2-2. Operator Preventive Maintenance Checks and Services Procedures-Cont.ItemIntervalItem to beEquipment is notNo.BDA WMInspectedProcedureready/Available If:11Map BoardEnsure collar (1)Will not fold orfunctions smoothly.open. Bent orCheck for cracks orbroken beyond use.breaks.SECTION III. OPERATIONS UNDER USUAL CONDITIONS2-4. ABBREVIATED SET-UP INSTRUCTIONS . This provides abbreviated instructions for those who have erectedthe tent before. Refer to paragraphs 2-5 through 2-18, if problems are encountered, for detailed assembly instructions.NOTEThe tent is designed to be easily erected by two soldiers inless than fifteen minutes. There is an alternate setupprocedure provided on labels sewn on the transport bag.Either setup procedure is authorized (bag or manual).a.Remove tent components from transport bags as needed in sequence.b.Expand the frame to an upside-down "U".c.Expand the frame width.d.Expand the length of the frame.e.Install the roof cap.f.Extend the legs to full height.g.Install the entrance way wall.h.Install the plain walls.Change 12-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business