ARMY TM 10-8340-224-13AIR FORCE TO 35E5-6-1NAVY NAVFAC-P-337.A2-26. PREPARATION FOR MOVEMENT. To prepare the TEMPER formovement, follow the procedures outlined in paragraphs a and bbelow. Clean and dry tent fabric sections and equipment asdescribed in paragraph 3-6. Package the tent into the transportbags as described in paragraph b below.a. Takedown procedures. First, locate the transport bags andthe light set storage container, then proceed as follows:Fold fabric,(1)Insulated Floors.(a)Remove debrisNOTElabel side out.and clean insulated floor.(b) Disconnect hook and pile tape fasteners atinsulated floor section joints.(c)Fold and remove individual insulated floorsections(2)Vestibules.(a)Remove single ply floors (1) .(b)Release tension on all guy lines (2) and removestakes (3) .(c)Unlace vestibule door (4) sides from vestibule(5) .102-68
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business