ARMY TM 10-8340-224-13
AIR FORCE TO 35E5-6-1
NAVY NAVFAC-P-337.A
2-26. PREPARATION FOR MOVEMENT. To prepare the TEMPER for
movement, follow the procedures outlined in paragraphs a and b
below. Clean and dry tent fabric sections and equipment as
described in paragraph 3-6. Package the tent into the transport
bags as described in paragraph b below.
a. Take down procedures . First, locate the transport bags and
the light set storage container, then proceed as follows:
Fold fabric,
(1)
Insulated Floors.
(a)
Remove debris
NOTE
label side out.
and clean insulated floor.
(b) Disconnect hook and pile tape fasteners at
insulated floor section joints.
(c)
Fold and remove individual insulated floor
sections
(2)
Vestibules.
(a)
Remove single ply floors (1) .
(b)
Release tension on all guy lines (2) and remove
stakes (3) .
(c)
Unlace vestibule door (4) sides from vestibule
(5) .
10
2-68