2-26. PREPAW4TION FOR MOVEMENT (CONT).
(e)
Place two soldiers at each arch (5) on side of
the tent being lowered.
(f)
On command, remove quick release pins (6)
holding arches erect.
CAUTION
Do not twist or turn frame
components when handling. Damage to
equipment may result.
NOTE
If pin cannot be removed easily,
loosen corner guy lines and adjust
the frame, then remove.
2-72
(9)
(h)
(i)
(j)
(k)
(1)
(m)
(n)
(o)
Relieve tension from four corner ropes.
Standing clear of tent place one hand below cave
joint of arch (5) and one on the cave purlin
(8) .
Swing out side frame.
Extra soldiers may
assist in lowering frame.
Remove luminaires.
Remove plenums.
Remove liners.
Remove light support strap assemblies.
Untie and remove single ply floor.
Disconnect cave purlin flaps.
Repeat steps a through h to lower other side of
the tent.
(5)
Removing The Fabric.
(a)
Disconnect hitch clip pins (l), remove fly (2)
from cave extenders (3) and remove cave
extenders (3) .
(b)
Untie tie off point and disconnect becket lacing