ARMY TM 10-8340-224-13AIR FORCE TO 35E5-6-1NAVY NAVFAC-P-337.A2-26. PREPARATION FOR MOVEMENT (CONT).(a)Release guy line (1) tension except at each tentcorner. Release tension on high wind lines (2)and disconnect from wooden stakes (3) .(b)Remove the stakes (3) and footstop tent pins(4) .(c)Remove partitions and modesty curtains, ifinstalled.(d)Disconnect all becket laces (5) up to cave.(e)Disconnect all the base purlin flaps (6) .(f)Untie liner and floor tie tapes (7) from basepurlin(8) and side arch assembly (9) .(g)Disconnect electric cables (10) fromdistribution box (11) . Remove distribution box(1) from power control stand (12). Remove powercontrol stand (12) .CAUTIONConnect all dust caps together.Dirt and dampness may damageelectrical connections.2-70
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business