2-25. DECALS AND INSTRUCTION PLATES (CONT) .
STEP-6
AFTER THE END WALLS AND ROOF SECTIONS ARE IN PLACE AND SECURED WE
WILL PLACE AND SECURE THE EXTENDER IN THEIR RESPECTIVE PLACES.
PLACE EXTENDERS OVER PIN PROTRUDING FROM FRAME. ALIGN HOLE IN
EXTENDER WITH HOLE IN PIN AND LOCK IN PLACE WITH SECURING CLIP.
USE ONE 19 GUY LINE ON EAVE EXTENDERS AND TWO 19 GUY LINES ON
RIDGE EXTENDERS. PASS SEWN END OF GUY LINE AROUND RIDGE OR EAVE
EXTENDERS AND THRU EYE SPLICE AS SHOWN ABOVE. AFTER GUY LINES ARE
IN PLACE, PASS SEWN END OF GUY LINES THRU BOTH HOLES IN TENT
SLIPS AND PLACE KNOT IN SEWN ENDS.
STEP-7
PLACE FLY ON EXTENDERS STARTING AT THE RIDGE. PLACE GROMMET OVER
PIN AND LOCK IN PLACE (SECURING CLIP ATTACHED TO FLY) WITH CLIP
THRU HOLE IN PIN. REPEAT THIS SEQUENCE TO SECURE FLY TO EAVE
EXTENDERS.
(ALL EAVE EXTENDERS HAVE TWO (2) SECURING CLIPS
ATTACHED) . ALL EAVE EXTENDERS SHOULD HAVE GUYLINES.
STEP-8
WHEN THE ROOF SECTIONS, ENDWALLS, FLY, AND GUYLINES ARE SECURED
IN PLACE WE CAN NOW RAISE THE TENT. PLACE TWO PEOPLE AT EACH ARCH
SECTION AT THE EAVE LOCATION. THE NCO IN CHARGE SHOULD MAKE
CERTAIN THAT THE FRAME IS RAISED EVENLY AND SIMULTANEOUSLY AT
EACH ARCH. ON HIS COMMAND RAISE THE SHELTER (AT EAVE LINE) AND
SWING THE LOWER LEG OF THE FRAME INTO.PLACE, THEN SECURE IN PLACE
WITH PIN. NOTE: THE PERSONNEL AT EACH END OF THE SHELTER SHOULD
MAKE CERTAIN THAT THE FABRIC DOES NOT GET CAUGHT IN THE FRAME
HINGE .
STEP-9
WE CAN NOW FINISH CLOSING THE TENT BY ENGAGING THE LOOPS AND
SECURING THEM. WHEN TENT IS IN THIS POSITION - CHECK SCREEN FLAP
LINES AND GUYLINES TO MAKE CERTAIN THEY ARE FREE TO OPERATE.
STEP-10
WE NOW RAISE THE OPPOSITE SIDE IN THE SAME MANNER. FINISH CLOSING
THE TENT.
Figure 2-5.
ABBREVIATED SET UP INSTRUCTIONS (CONT)