INSTALL 15FT CROSSWAY CABLE
THIS SECTION COVERS:
Installation (one time procedure)
INITIAL SETUP
Cable mounting brackets installed by fielding contractor
Maintenance Level
Materials/Parts
Unit
Tools and Special Tools
Shop Equipment Automotive Maintenance and Repair:
Organizational Maintenance, Common No. 1 (WP 0038, Table 2, Item 2)
INSTALL
Before the MBU can be used with the MKT, the Crossway Cable (1) must be installed under the trailer.
This is a one time procedure performed when the MBU is initially fielded. Once installed, the Crossway
Cable remains in place unless the cable is damaged in some way and requires replacement.
The cable clamps (2) that secure the Crossway Cable to the MKT support beam (3) are installed by the
fielding contractor and will be in place prior to installing the Crossway Cable.
To install the Crossway Cable (1), take position with the required tools under the right, rear end of the
MKT in the vicinity of the cooling cabinet which houses the Power Converter Mounting Bracket.
Locate the support beam (3) on which the cable clamps (2) are mounted.
Distribute the Crossway Cable (1) along the ground under the trailer support beam (3) so that an equal
amount of cable is available to pass up through the trailer floor under the cooling cabinet as well as
under the left side between the cabinet and griddle.
Approximately 1 to 1-1/2 ft of cable should be available on each end to pass through the trailer floor.
Once the cable has been distributed to allow a sufficient amount to pass up through the floor of the
trailer, move to the far left end of the support beam and remove the screw (4) that secures the first cable
clamp (5).
Place the cable in position on the support beam (3) and reinstall the clamp.
Move down the support beam, installing the cable under each clamp, one at a time, until the entire cable
has been installed under all the clamps.
While under the cooling cabinet area on the right side of the trailer, remove the rubber grommet (6)
mounted in the trailer floor.
Cut the grommet and install over the Crossway Cable (1).
Push the connector (7) of the Crossway Cable up through the hole in the floor of the trailer and reinstall