TM 10-7310-281-13&P
MODERN BURNER UNIT (MBU)
0016 00
OPERATOR SERVICES
0016 00-1/2 blank
CLEAN AIR VENT ASSEMBLY ORIFICE
THIS SECTION COVERS:
Service (as required)
INITIAL SETUP
MBU shut-down and cool (WP 0005)
Maintenance Level
Materials/Parts
Operator
Tools and Special Tools
Accessory Outfit, Gasoline, Field Range with Baking Rack (WP 0038, Table 2, Item 1)
Clean Air Vent Assembly Orifice. Locate the Air Vent Assembly (1) on the top surface of the fuel tank
(3). The Air Vent Orifice (2) is the 3/8 inch diameter hole located on the side of the assembly facing the
rear of the MBU. Ensure that the orifice is clear of any dust or debris as this would prevent venting of the
fuel tank and affect fuel flow. DO NOT use any tool or object that would push any debris further into the
orifice. Use a small cleaning brush to clean the debris out of the orifice.
Cleaning the Air Vent Valve Orifice
END OF WORK PACKAGE
1
2
3