TM 10-7310-281-13&PMODERN BURNER UNIT (MBU)0018 00SERVICE UPON RECEIPT0018 00-1UNPACKINGThe initial fielding of the MBU and its associated components, including equipment modifications to the MKT toaccommodate the system, will be accomplished using contractor resources. Subsequent shipments containingreplacement items will be individually packaged. None of these components require any kind of de-processing.They should be removed from their packing containers and used as outlined in WP 0005.INSPECTIONInspect the shipment, noting any damage sustained during shipping or handling. Report all discrepancies inaccordance with DA PAM 738-750. Unpack the box and inventory its contents against the packing slip to see ifthe shipment is complete. Also inspect the equipment for damage incurred during shipment. If the equipment hasbeen damaged, report the damage on SF 361, Transportation Discrepancy Report.FOOD SERVICE SYSTEM EQUIPMENT MODIFICATIONThe adaptation of the MBU to the field feeding systems indicated above does not require modification of anyequipment, except the Mobile Kitchen Trailer (MKT). Three modifications to that system are necessary. All threewill be applied by the fielding contractor prior to issue of the MBU equipment to the using unit. Thesemodifications involve the installation various components as described in the sections that follow.Figure 4-1 Overview of MKT ModificationThis section of cable is underneath thedeck of the MKT.The 50 foot 110Vac extension cable is fedthrough the floor at this location.GriddleMBUMBUMBUMBUMBUMBU
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business