TM 10-5411-224-14
TABLE 5-1. DIRECT SUPPORT TROUBLESHOOTING
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. SHELTER DAMAGED
Step 1. Inspect shelter and door interior and exterior for dents or punctures.
NOTE
Punctures can cause a loss of EMI/RFI integrity. Repairs should be performed as soon as
possible.
Repair dents in accordance with paragraph 5-6.
Repair punctures in accordance with paragraph 5-7 or 5-8 as appropriate.
Step 2. Inspect panel surfaces for delamination in accordance with paragraph 5-9.
Repair delaminations in accordance with paragraph 5-9.
Step 3. Inspect drip molding above top of door exterior for damage.
Replace drip molding in accordance with paragraph 5-10.
2. DRAIN PLUG NOT SEALING PROPERLY.
Step 1. Inspect for presence of drain plug and secure fit in drain tube.
If missing or fails to fit tight in drain tube, replace in accordance with paragraph 5-11.
3. DIFFICULTY ACCESSING SHELTER ROOF FROM STEPS.
Step 1. Inspect handhold assembly for damage or improper operation.
If difficult to move to upright position, lubricate in accordance with Lubrication Order,
Appendix G.
If damaged, repair in accordance with paragraph 5-12.
4. LIFTING RINGS CONTACT SHELTER WALL.
Step 1. Inspect lifting ring bumpers for damage or missing areas.
Repair in accordance with paragraph 5-13.
5-2
