TM 10-5411-224-14
Table 2-1. Operator Preventive Maintenance Checks and Services for LMS.
Location
Item No.
Interval
Item to
Check/ Service
Procedure
Not Fully Mission
Capable if:
9
After
Door Stay Assembly
Make sure door stay arm engages
keeper securely and easily.
.
10
After
Door Assembly
Make sure drip molding is intact.
Check door surface for punctures.
Punctures are present.
Ensure weather gasket is in good
condition.
Gasket is damaged
Make sure EMI/RFI gasket is in good
condition.
Gasket is damaged.
11
After
Lifting Rings
Inspect for corrosion or excessive wear.
Rings excessively
corroded or worn.
12
After
Roof Access Steps
Make sure steps operate smoothly and
stay in the up or down position.
Check for loose or missing hardware.
13
After
Roof Handle
Ensure handle is securely mounted to
roof.
SECTION III. OPERATION UNDER USUAL CONDITIONS
2-4. ASSEMBLY AND PREPARATION FOR USE.
a.
Unpacking. The LMS shelter does not require any special unpacking instructions.
b.
Assembly. The LMS shelter requires some assembly depending on the mode of operation. For operation on the
move, there are no assembly instructions. To operate the LMS in a fixed site mode of operation, install the ladder
assembly using the following procedure:
2-4