TM 10-5411-203-13
Operator Preventive Maintenance
Checks and Services Table
B - Before D - During
Item
Interval
Item To Be Inspected
Equipment Is Not
No.
Ready/Available
B
D
Procedure
If:
2
3
Remove debris, snow, or ice from top or sides of connector
assembly (1) as needed.
FRAME ASSEMBLY. Check frame
assembly (4) for bends, breaks, and
broken or missing parts. Check
frame assembly's hinges, locking
pins, and seals for breakage.
Frame assembly (4) or hinges are
damaged so frame assembly is not
usable.
Exterior frame assembly will not
support fabric properly.
EXTERIOR FRAME ASSEMBLY (TYPE II ONLY).
Check swivel feet (1), header bar (2), and upright
bars (3) for dents, bends, breaks, loose fittings, and
broken or missing parts. Check support straps (4)
for tears or breakage.
2-3