TM 10-5411-203-13
CHAPTER 2
OPERATING INSTRUCTIONS
Section I. DESCRIPTION AND USE OF OPERATOR'S CONTROLS AND INDICATORS
Not applicable.
Section II. OPERATOR PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
2-1.
GENERAL. The Complexing Kit Passageway must be inspected at intervals to find and correct defects.
a.
Before you operate. Always keep in mind the CAUTIONS and WARNINGS. Perform your before (B) PMCS.
b.
While you operate. Always keep in mind the CAUTIONS and WARNINGS. Perform your during (D) PMCS.
2-2.
PMCS PROCEDURES
a.
Your Preventive Maintenance Checks and Services table lists the inspections and care of your equipment to
keep it in good operating condition.
b.
Use the "Item No." column of the PMCS table to supply the item number used in the "TM Number" column of DA
Form 2404, Equipment Inspection and Maintenance Worksheet, in recording results of PMCS.
c.
The "Interval" column of your PMCS table tells you when to do a certain check or service: all PMCS actions are
performed before and during use.
d.
The "Procedure" column of your PMCS table tells you how to do the required checks and services. Carefully
follow these instructions.
e.
The "Equipment Is Not Ready/Available If:" column tells you when and why your equipment cannot be used.
NOTE
The terms ready/available and mission capable refer to the same status: Equipment is
on hand and is able to perform its combat missions. Refer to DA Pam 738-750, The
Army Maintenance Management System (TAMMS).
2-1