TM 10-5411-203-132-3.IF YOUR EQUIPMENT FAILS TO OPERATE. Defects dissevered before and during use will be noted for futurecorrection, to be made as soon as use is discontinued. Stop use immediately if any defect is noted that would imparecontinued use of the Complexing Kit Passageway or endanger personnel. Report all defects on DA Form 2404. Refer toDA PAM 738-750, The Army Maintenance Management System (TAMMS), for instructions.Section III. OPERATION UNDER USUAL CONDITIONS2-4.INSTALLATION AND PREPARATION FOR USEa.InstallingComplexingKitPassageway-TypeI(ISOSheltertoISOShelter)NOTEThe following procedure requires four personnel.(1) Be sure the desired sidewall or endwall closeout panels face each other and ISO shelters are no more than 69 in. (1752 mm) apart.2-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business