TM 10-5411-201-14
T.O. 35E4-178-1
4-8.
POWER ENTRY PANEL ASSEMBLY TESTING, REPLACEMENT, AND REPAIR
This task covers:
a.
Testing
d.
Repair
b.
Removal
e.
Installation
c.
Cleaning, Inspection
INITIAL SETUP
Standard Tools
General mechanics tool kit
Test Equipment
Multimeter, Appendix B, Item 4
Personnel Required
Electrician
TESTING
1.
Connect site power.
2.
Unscrew connector covers from connectors.
3.
Set all circuit breakers in ON position.
4.
Using multimeter, check for proper voltage at each receptacle pin.
5.
If improper voltage is present, replace defective receptacles,
terminals/connectors, or panel wiring.
(Refer to paragraph 5-3).
REMOVAL
Receptacles
1.
Inside shelter, remove screws (1), lockwashers (2) and washers (3),
and carefully lift cover assembly (4) away from personnel door end
endwall panel as far as it will go.
2.
Disconnect wires (20) from receptacles (10, 11, 17, and 18) at back
of panel (5).
4-14