TM 10-5411-201-14
T.O. 35E4-178-1
2-21.
(cont)
NOTE
Two personnel are required to perform the
following procedure.
a.
To install the storm configuration (tie-down installation) kit, use
the following items.
(1) Ground anchor assembly.
(2) Driving rod.
(3) Holding handle.
(4) Driving head.
(5) Tiedown ring.
-be worn by personnel
Safety
glasses
must
when installing ground
anchors
.
2-34