TM 10-5411-201-14
T.O. 35E4-178-1
2-16.
(cont)
e.
Release all latches between hinged sidewall, endwall, roof, and
floor.
f.
Lower support struts and raise hinged roof to full extent of strut.
g.
Disengage quick release pin and stop plate for cable on load
balancer.
h.
Lower hinged floor with leveling jacks.
i.
Fold in hinged endwall to roof beam and hold in place with velcro
straps.
j.
Lower hinged roof by using support struts and personnel at each end
of roof.
k.
Slide hinged roof inward to stowage position by pulling down on
solar bar handles.
1.
Remove leveling jacks supporting hinged floor and stow on left cargo
door.
m.
Remove sidewall support braces and store in equipment container.
W A R N I N G
To avoid injury, be careful not to get caught between
cable and sidewall panel.
Do not attempt to control
panel if it is accidentally dropped.
n.
Fold down hinged sidewall onto hinged floor.
Allow wall to free
fall before it comes to the same plane as the cables.
Trapped air acts as a
cushion.
o.
Position camlocks so handles are horizontal and outward.
P.
Raise hinged floor and camlock to corner post.
Engage lower locks
first.
Make sure pins are in holes.
NOTE
If hinged floor and corner post bind, relevel shelter.
q.
Close cargo doors.
2-31