TM 10-5411-201-14T.O. 35E4-178-12-16.(cont)e.Release all latches between hinged sidewall, endwall, roof, andfloor.f.Lower support struts and raise hinged roof to full extent of strut.g.Disengage quick release pin and stop plate for cable on loadbalancer.h.Lower hinged floor with leveling jacks.i.Fold in hinged endwall to roof beam and hold in place with velcrostraps.j.Lower hinged roof by using support struts and personnel at each endof roof.k.Slide hinged roof inward to stowage position by pulling down onsolar bar handles.1.Remove leveling jacks supporting hinged floor and stow on left cargodoor.m.Remove sidewall support braces and store in equipment container.W A R N I N GTo avoid injury, be careful not to get caught betweencable and sidewall panel.Do not attempt to controlpanel if it is accidentally dropped.n.Fold down hinged sidewall onto hinged floor.Allow wall to freefall before it comes to the same plane as the cables.Trapped air acts as acushion.o.Position camlocks so handles are horizontal and outward.P.Raise hinged floor and camlock to corner post.Engage lower locksfirst.Make sure pins are in holes.NOTEIf hinged floor and corner post bind, relevel shelter.q.Close cargo doors.2-31
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business