TM 10-5411-201-14
T.O. 35E4-178-1
2-16.
(cont)
r.
Remove container lift jacks and stow on personnel and right cargo
doors.
NOTE
If it is intended to use a dollyset tO move shelter,
place pieces of 4x4 lumber under the frame and clear
of the ISO fittings to facilitate mounting of the dollyset.
s.
Stow power cable inside shelter.
t.
Check security of shelter.
Quick release pins must be inserted in
stop plates on load balancer.
Place padlocks on outside door handles.
Section IV.
OPERATION UNDER USUAL CONDITIONS
NOTE
If equipment fails to operate, refer to troubleshooting
procedures in Chapter 3.
2-17.
OPERATING INSTRUCTIONS.
Due to the limited operating capability of
shelter, operating instructions are limited to operation of circuit breakers
and switches for the purpose of providing power to lights, outlets, and
externally connected environmental control unit (ECU), if installed.
Expanding the shelter and closing the shelter includes maintaining the shelter
when performing any PMCS exercise "During" functions.
Section V.
OPERATION UNDER UNUSUAL CONDITIONS
2-18.
GENERAL .
This section provides instructions for operation of the
shelter in unusual weather conditions.
Operation during blackout conditions
Is also provided.
2-32