TM 10-5411-201-14T.O. 35E4-178-12-15.(cont)(3) Turn MAIN circuit breaker to ON position and observe anyunusual conditions.(4) Turn remaining circuit breakers to ON position one at a timeand observe any unusual conditions.c.ECU Connection.(1) Turn CB1 to OFF position.(2) Connect ECU supply cable to connector (J2).(3) Turn CB1 to ON position and observe for any unusual conditions.2-16.CLOSING SEQUENCENOTEFour personnel are required to perform the followingprocedures.Make sure hinged floor is clear of items or debris andfloor hinges are clean of sand or dirt.Make sure top of hinged roof is clear of items, debris,snow, or ice and hinged floor extension is clear of foreignmatter, snow or ice.Do not attempt to lower or remove container lift jacksuntil after procedures in steps a through q have beencompleted.a.Remove power cord from power entry panel.b.Remove ECU intake and return panels and replace with closeoutpanels.c.Remove hinged roof area ceiling lights and receptacles from expandedsection and return to their stowage position.d.Remove and stow latch plates in equipment container.It is essential that the complete latch ispressed flat into the pan.2-30
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business