TM 10-5411-201-14
T.O. 35E4-178-1
2-15.
(cont)
(3) Turn MAIN circuit breaker to ON position and observe any
unusual conditions.
(4) Turn remaining circuit breakers to ON position one at a time
and observe any unusual conditions.
c.
ECU Connection.
(1) Turn CB1 to OFF position.
(2) Connect ECU supply cable to connector (J2).
(3) Turn CB1 to ON position and observe for any unusual conditions.
2-16.
CLOSING SEQUENCE
NOTE
Four personnel are required to perform the following
procedures.
Make sure hinged floor is clear of items or debris and
floor hinges are clean of sand or dirt.
Make sure top of hinged roof is clear of items, debris,
snow, or ice and hinged floor extension is clear of foreign
matter, snow or ice.
Do not attempt to lower or remove container lift jacks
until after procedures in steps a through q have been
completed.
a.
Remove power cord from power entry panel.
b.
Remove ECU intake and return panels and replace with closeout
panels.
c.
Remove hinged roof area ceiling lights and receptacles from expanded
section and return to their stowage position.
d.
Remove and stow latch plates in equipment container.
It is essential that the complete latch is
pressed flat into the pan.
2-30