TM 10-5411-201-14T.O. 35E4-178-15-4.ROOF PANEL REPLACEMENTThis task covers:a.Removalb.InstallationINITIALSETUPSpecialTOOlSPersonnelTop lifting container lift sling,1 ElectricianAppendix DMaterialsStandardToolsSealing compound, Item 19,General mechanics tool kitAppendix ESolvent, Item 20, Appendix ER E M O V A L1.2.3.4.5.6.7.8.9.Disconnect site power.Remove receptacle outlets. (Refer to paragraph 4-13)Set main circuit breaker and circuit breaker CB6 to off position.Remove hinged roof.(Refer to paragraph 4-20)Remove fixed roof area ceiling lights. (Refer to paragraph 4-12)Disconnect and remove all wires from fixed roof beam. Tag all wiresfor reconnection. (Refer to paragraph 4-16)Remove bolts (l), lockwashers (2), and washers (3) securing fixed roofto upper ISO fittings (4).Remove bolts (5), lockwashers (6), and washers (7) securing fixed roofto fixed personnel endwall and sidewall.Remove bolts (8), lockwashers (9), washers (10) and drip cap (11)securing fixed roof to fixed cargo endwall.W A R N I N GMethylethylketone is flammable and toxic and shallbe used in a well-ventilated area away from sparksor open flame.Gloves should be worn during use.10. Apply solvent to sealed interface areas between roof, sidewall, andendwalls.5-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business