TM 10-5411-201-14
T.O. 35E4-178-1
6-2.
(cont)
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Secure web straps around shelter body.
Attach lifting sling to upper ISO fitting.
Lift shelter body and lower to position above fixed floor.
Apply sealing compound to interface areas of floor and fixed
endwalls.
Lower shelter body carefully to fixed floor.
Ensure that corner posts engage lower ISO fittings at all four
corners.
Position shim (17) under plate (16) and install lockwashers (15) and
screws (14).
Secure fixed cargo endwall to floor with washers (13), lockwashers
(12), and bolts (11).
Secure fixed personnel endwall to floor with washers (6),
lockwashers (5), and bolts (4).
Secure reinforcement angles (10) to floor with washers (9),
lockwashers (8) and screws (7).
Secure corner posts (2) to lower ISO fittings (3) with bolt (l).
Install hinged floors in accordance with paragraph 4-23.
6-4