TM 10-5411-201-14
T.O. 35E4-178-1
4-25.
(cont)
12.
Support fixed endwall and remove by using a putty knife (or similar
tool) to break bond between endwall and fixed roof, fixed floor, and
corner posts.
Level Assembly
13.
Drill
(26) .
out six rivets (25) and remove each of two level assemblies
(Refer to paragraph 4-33)
Folding Step
14.
Remove two screws (27) and lockwashers (28) and remove each of five
folding steps (29).
4-119