TM 10-5411-201-14
T.O. 35E4-178-1
4-25.
(cont)
7.
Position folding step (5) and install lockwashers (4) and screws
(3) .
8.
Position level (2) and install rivets (1).
(Refer to paragraph 4-33)
INSTALLATION
Folding Step
1.
Position each of five folding steps
(29) against panel and install two
lockwashers (28) and screws (27).
Level Assembly
2.
Secure each of two level assemblies
(26) by installing six rivets (25).
(Refer to paragraph 4-33)
NOTE
Level assemblies must be calibrated after assembly
of shelter is complete.
Use a four foot level or
other suitable tool and adjust three setscrews on
level to calibrate.
Personnel Door End Endwall Panel
3.
From outside shelter, position fixed endwall on fixed floor and push
inward until endwall is against corner posts mating surfaces.
4.
Align fixed endwall mounting holes with mounting holes and inserts
in corner posts, fixed roof, reinforcement angles, and endwall
hinge.
4-123