TM 10-5411-200-14
T.O. 35E4-177-1
4-7.1 (cont)
ASSEMBLY
1.
Align spacers (8) and circuit breaker box (2) with new inserts and
secure with screws (5), lockwashers (6), and washers (7).
2.
Slide new conduit (P/N 5-4-5061-2) over wires and secure in box on left
side of roof beam.
3.
Insert conduit (3) and (4) into circuit breaker box (2) and secure with
insulated connectors (1).
4.
Refer to paragraph 4-7 for installation of circuit breakers, light
switches, wiring, and panel board with cover.
5.
Connect shelter electrical power and remove tags.
6.
Refer to paragraph 4-7 for testing.
l
4-8.
POWER ENTRY PANEL ASSEMBLY TESTING, REPLACEMENT, AND REPAIR
This task covers:
a.
b.
Testing
d. Repair
Removal
e.
Installation
c.
Cleaning, Inspection
INITIAL SETUP
Standard Tools
Personnel Required
General Mechanics Tool Kit
Electrician
Test Equipment
Multimeter, Appendix B, Item 4
CHANGE 2
4-13