TM 10-5411-200-14T.O. 35E4-177-14-7.1 (cont)ASSEMBLY1.Align spacers (8) and circuit breaker box (2) with new inserts andsecure with screws (5), lockwashers (6), and washers (7).2.Slide new conduit (P/N 5-4-5061-2) over wires and secure in box on leftside of roof beam.3.Insert conduit (3) and (4) into circuit breaker box (2) and secure withinsulated connectors (1).4.Refer to paragraph 4-7 for installation of circuit breakers, lightswitches, wiring, and panel board with cover.5.Connect shelter electrical power and remove tags.6.Refer to paragraph 4-7 for testing.l4-8.POWER ENTRY PANEL ASSEMBLY TESTING, REPLACEMENT, AND REPAIRThis task covers:a.b.Testingd. RepairRemovale.Installationc.Cleaning, InspectionINITIALSETUPStandardToolsPersonnelRequiredGeneral Mechanics Tool KitElectricianTest EquipmentMultimeter, Appendix B, Item 4CHANGE 24-13
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business