TM 10-5411-200-14T.O. 35E4-177-14-7.1 (cont)REMOVAL1.Tag and disconnect shelter electrical power.2. Refer to paragraph 4-7 for removal of panel cover, panelboard, lightswitches, circuit breakers.DISASSEMBLY1.Remove insulated connectors (1) from inside circuit breaker box (2),pull conduit and wires, (3) and (4) away from box. Remove other end ofconduit (4) from box on left side of roof beam.Slide conduit overwires and discard.A new piece of conduit which is 2-inches longerwill be used during installation of new box.2. Remove four screws (5), lockwashers (6), flat washers (7), and removecircuit breaker box (2) and spacers (8) from the wall.CHANGE 24-12.1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business