Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
CORNER POST AND ISO FITTING ASSEMBLY REPLACEMENT AND REPAIR (cont) - TM-10-5411-200-14_293
FLOOR PANEL REPLACEMENT (cont) - TM-10-5411-200-14_295
TM-10-5411-200-14
Page Navigation
269
270
271
272
273
274
275
276
277
278
279
TM 10-5411-200-14
T.O. 35E4-177-1
CHAPTER 6
GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
6-1. GENERAL.
This chapter consists of maintenance procedures for general
support personnel.
These procedures are
limited to the floor panel
replacement (paragraph 6-2).
6-2.
FLOOR PANEL REPLACEMENT
This task covers:
a.
Removal
b.
Installation
INITIAL
SETUP
Special
tools
Materials
Hand blind riveter
Solvent, Item 20, Appendix E
Lifting sling, Tandemloc No.
References
No. 74016B-20A
4-23 Hinged floor panel
Web straps
replacement and repair
Standard
Tools
General mechanics tool kit
Personnel - 4
REMOVAL
6-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business