TM 10-5411-200-14
T.O. 35E4-177-1
6-2.
(cont)
8.
Position shim (17) under plate (16) and install lockwashers (15) and
screws (14).
9.
Secure fixed cargo endwall to floor with washers (13), lockwashers
(12), and bolts (11).
10.
Secure fixed personnel endwall to floor with washers (6),
lockwashers (5), and bolts (4).
11.
Secure reinforcement angles (10) to floor with washers (9),
lockwashers (8) and screws (7).
12.
Secure corner posts (2) to lower ISO fittings (3) with bolt (l).
13.
Install hinged floors in accordance with paragraph 4-23.
6-4