TM 10-5410-284-13&P
TM 10602A-13&P
LIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)
0010 00
PREVENTIVE MAINTENANCE CHECK AND SERVICES (PMCS)
0010 00-3
THIS SECTION COVERS:
PMCS Checks and Services
INITIAL SETUP:
Frame Assembly unpacked
Maintenance Level
Unit
Table 0010 00-1. Preventive Maintenance Checks and Services for LME.
ITEM
INTERVAL
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
1
Before
Frame
Inspect frame components for damage, such as bents,
Frame component
Assembly
cracks, dents. Check for missing parts such as quick
does not (un)fold.
release pins (1) and lanyards (2). Check for free
Frame parts bent
movement of hinged parts (3). Check the lower leg
or deformed. Quick
assemblies (4) for damage to the feet (5). Check for
release pins
condition of the eave (6) and ridge (7) gusset plates.
missing or broken.
Feet on lower leg
assemblies
broken.