TM 10-5410-230-13
Section III. OPERATION UNDER USUAL CONDITIONS
2-2. SITE SELECTION. Select an area large enough for vehicle and erected Boot Wall. Ensure that area is relatively
level and is free of large holes, trees, rocks, and debris. Make sure that site will drain properly in event of inclement
weather. Positioning front of vehicle lower than rear will encourage proper drainage. Check unit SOP to ensure that site
selection and MCPS tent layout will be acceptable.
2-3. REMOVAL OF MCPS TENT WALL. If a wall assembly is already in place on the side of the MCPS tent that will be
attached to Boot Wall, it must be removed as follows:
a. Release all quick disconnect (1) and hook and pile fasteners (2) at inside and outside corners.
b. Remove wall (3) by releasing all quick disconnect (1) and hook and pile fasteners (2) from roof assembly.
c.
Fold wall (3) with identification label visible and place in fabric transport bag.
2-9