TM 10-5410-229-13&PSection III. OPERATOR’S MAINTENANCE PROCEDURES3-4. INSPECTION. Perform inspection as described in Chapter 2, Section II, PMCS. Report defects on DA Form 2404.3-5. CLEANING.Clean all MCPS fabric components with a brush (Item 2, Appendix F) and mild soapy water (Item 1,Appendix F). Let fabric components air dry.3-6. REPAIR LIGHT SET, TYPE II.This task covers:a. Remove and Install Fuseb. Remove and Install LampINITIAL SETUPTools:NoneMaterials/Parts:FuseLampEquipmentCondition:Luminaire turned off and disconnecteda.Remove and Install Fuse.WARNINGTurn off power before replacing fuse or lamp. Lethal voltage is presentwhen power is applied to light set. Electrical shock and death may resultfrom failure to heed this warning.(1) Remove Fuse.3-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business