TM 9-4931-374-13&P
2-5. PREPARATION FOR MOVEMENT (cont)
e. Stowing of Wall Shelving.
(1) Remove each wall shelf (1) with two attached brackets (2) from
(7) Place four stools (9) and equipment storage chest (10) in
shelter wall panel by removing four screws (3) and four flat
between tiedown rings (8).
washers (4).
(8) Secure four stools (9) and equipment storage chest (10) in
(2) Remove two brackets (2) from each wall shelf (1) by removing
place by tying to tiedown rings (8) with four straps (11).
two nuts (5), two flat washers (6), and two screws (7).
2-22