TM 9-2330-390-14&P
4-137. STORAGE BOX MOUNTING BRACKETS REPLACEMENT (SIDE LIFT KIT).
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
l
Storage box removed (see paragraph 4-138).
l
Eight locknuts
Tools/Test Equipment:
l
General mechanics tool kit (item 30, Appendix G)
Remove eight locknuts (5). fiatwashers (4) four
U-bolts (3) and two mounting brackets (2) from
axle assembly (1) on front doily. Discard locknuts.
1.
Position two mounting brackets (2) on axle
assembly (1) of front doily. To ensure correct posi-
tioning of mounting brackets, place storage box
on mounting brackets with hinged side of storage
box facing pivoting tray. Adjust positioning as
required. Remove storage box.
2.
Install four U-bolts (3) eight flatwashers (4) and
new locknuts (5) on axle assembly (1).
Follow-on Tasks:
l
Install storage box (see paragraph 4-138).
4-398