TM 9-2330-390-14&P
4-101. AIR BAG REPLACEMENT (Cont).
1.
Install stud (19) on axle mounting plate (17) and turn air bag (20).
2.
Evenly raise axle assembly (18) until studs (8 and 9) are positioned through holes in suspension link mounting
plate (16). Support axle with two trestles.
3.
4.
Remove support (6) from suspension links (1).
Install two flatwashers (10 and 15) and new locknuts (11 and 14) on studs (8 and 9). Torque locknuts to 25 lb.-ft.
(34 Nm).
4-258