4-101. AIR BAG REPLACEMENT.
This Task Covers:
a.
Removal
b. Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Dolly set lowered, front and rear dollies detached
Sealing compound (Item 10, Appendix F)
(see paragraph 2-8).
Two locknuts
Steering locking pin installed in steering link.
Shock absorbers removed from axle (see para-
Personnel Required: Two
graph 4-102).
Tools/Test Equipment:
General mechanics tool kit (Item 30, Appendix G)
Hydraulic jack, 12 ton (Item 17, Appendix G)
Trestles (four) (Item 32, Appendix G)
Torque wrench, 0-175 lb.-ft. (Item 42, Appendix G)
Suitable support
4-255