TM 9-2330-390-14&P4-2474-97.TOOLBOX MOUNTING BRACKETS REPLACEMENT.This Task Covers:a.Removalb.InstallationInitial Setup:Equipment Conditions:• Toolbox removed (see paragraph 4-103).Tools/Test Equipment:• General mechanic's tool kit (Item 30, Appendix G)• Portable electric drill (Item 8, Appendix G)• Twist drill set (Item 9, Appendix G)• Blind hand riveter (Item 24, Appendix G)Materials/Parts:• Four rivetsWARNINGWear eye protection when using electric drill to drill out rivets. Failure to follow thiswarning may cause serious eye injury to personnel.1.Drill out four rivets (3) from mounting brackets(1). Discard rivets.2.Remove two mounting brackets (1) from bot-tom beam (2).Install two mounting brackets (1) on bottombeam (2) with four new rivets (3).Follow-onTasks:•Install toolbox (see paragraph 4-103).a.REMOVALb.INSTALLATION
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business