TM 9-2330-390-14&P
4-242 Change 4
4-92.
FRONT DOLLY JUNCTION BOX BRACKET REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Signal conditioning box and forward junction box
removed (see paragraph 4-33).
Marker clearance light removed (see paragraph 4-
38)
Reflector removed (see paragraph 4-104).
Materials/Parts:
Five locknuts
Tools/Test Equipment:
General mechanic's tool kit (Item 30, Appendix G)
Remove five locknuts (3), flatwashers (5),
capscrews (2), flatwashers (2.1), and bracket
(1) from brace (4). Discard locknuts.
Install bracket (1) on brace (4) with five flat-
washers (2.1), capscrews (2), flatwashers
(5), and new locknuts (3).
Follow-on Tasks:
Install reflector (see paragraph 4-104).
Install marker clearance light (see paragraph 4-38).
Install signal conditioning box and forward junction box (see paragraph 4-33).
a.
REMOVAL
b.
INSTALLATION
2.1
3
2.1