Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REAR DOLLY SHUTOFF VALVE AND MOUNTING BRACKET REPLACEMENT[ - cont
REAR DOLLY PARKING BRAKE VALVE REPLACEMENT - cont
TM-9-2330-390-14P Semitrailer Tank: 5 000 Gallon (Portable Water Dispensining) XM1098 (NSN 2300-01-330-2779) Manual
Page Navigation
383
384
385
386
387
388
389
390
391
392
393
TM 9-2330-390-14&P
4-69. REAR DOLLY PARKING BRAKE VALVE REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
l
Wheels chocked.
l
Air reservoir drained (see paragraph 3-8).
Tools/Test Equipment:
l
General mechanic’s tool kit (Item 30, Appendix G)
Materials/Parts:
l
Marker tags (Item 28, Appendix F)
l
Antiseize tape (Item 29, Appendix F)
l
Two
lockwashers
NOTE
All air lines should be tagged before removal. Refer to paragraph 4-18 for tagging
1.
2.
3.
4.
5.
instructions.
Place parking brake lever (8) in OFF position.
Disconnect tube assemblies (7 and 10) from tee
(9).
Disconnect tube assembly (6) from elbow (12).
Remove two nuts (2), screws (5),
lockwashers
(4),
and parking brake valve (11) from pivoting tray
(3). Discard lockwashers.
Remove elbow (12) tee (9) and plug (1) from
parking brake valve (11).
4-160
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business