TM 9-2330-390-14&P4-47. FRONT DOLLY MARKER CLEARANCE LIGHT CABLE ASSEMBLIESREPLACEMENT (Con’t).8.On right side, install left side cable assembly (12) on brace (13) with clamp (16), screw (17), fiatwasher (15),and new locknut (14).9.Install screw (6), new lockwasher (4), fiatwasher (3), ground wire (2), and new locknut (1) on marker clearancelight body (9) and bracket (5).10.Install lens housing (7) on marker clearance light body (9) with two screws (8).11.Connect cable assembly connector plug (11) to marker clearance light connector plug (10). Wrap connectorplugs with new tie-down straps.12.Repeat steps 9 through 11 for left side.Follow-On Task• Connect intervehicular cable to towing vehicle (see paragraph 2-11).• Check operation of front dolly marker clearance lights.4-94
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business