Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
MARKER CLEARANCE LIGHT MAINTENANCE - cont
BLACKOUT STOPLIGHT-TAILLIGHT REPLACEMENT - cont
TM-9-2330-390-14P Semitrailer Tank: 5 000 Gallon (Portable Water Dispensining) XM1098 (NSN 2300-01-330-2779) Manual
Page Navigation
294
295
296
297
298
299
300
301
302
303
304
TM 9-2330-390-14&P
4-39. BLACKOUT STOPLIGHT-TAILLIGHT REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
• Intervehicular cable disconnected from towing
• Marker tags (Item 28, Appendix F)
vehicle (see paragraph 2-7).
• Tie-down straps
Tools/Test Equipment:
• Two locknuts
• Two lockwashers
• General mechanic’s tool kit (Item 30, Appendix G)
NOTE
All wires should be tagged before removal. Refer to paragraph 4-18 for tagging
instructions.
Cut tie-down strap from connector plugs (3 and 7). Disconnect two cable assembly connector plugs (3) from
blackout stoplight-taillight connector plugs (7). Discard tie-down strap.
Remove two locknuts (6) flatwashers (5),
lockwashers
(4) and blackout stoplight-taillight (1) from taillight
assembly housing (2). Discard
lockwashers
and locknuts.
1.
2.
4-70
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business