TM 9-2330-390-14&P
4-34.
SIGNAL CONDITIONING BOX REPAIR (Cont).
9.
Install four capscrews (9) new lockwashers (11), and nuts (12).
10.
Connect wires (1) to 12-volt receptacle connector (2) and wires (1) to 24-volt receptacle connector (4) (see
paragraph 4-26).
11.
Close cover (3) and tighten two screws (6).
8.
Position 24-volt receptacle connector (4) on cover (3) with alinement key (10) at 12 oclock position. Position
receptacle cover (8) on cover with hinged side facing 12 oclock position.
Install 12-volt receptacle connector (2) on cover (3) with two capscrews (7), new lockwashers (13), and nuts
(14).
7.
. Install signal conditioning box and forward junction box (see paragraph 4-33).
Check operation of lights.
Follow-on Tasks:
4-53