TM 9-2330-390-14&P
4-34.
SIGNAL CONDITIONING BOX REPAIR (Con?).
4.
5.
6.
Install wires (1) on terminals (16) of circuit breaker (17) with two nuts (15).
Repeat steps 4 and 5 as required to install three remaining circuit breakers (17).
If circuit breaker mounting bracket (18) was removed, install bracket on signal conditioning box (5) with two
clipnuts (21), flatwashers (19), and panhead screws (29).
install circuit breaker (17) on bracket (18).
3.
1.
2.
Install voltage reducer (22) on signal conditioning box (5) with three screws (23) and nuts (24).
Connect two wires (1) of voltage reducer (22) to their points of attachment at either circuit breaker (17) or 12-volt
or 24volt receptacle connector (2 or 4).
Perform steps 7, 10, and 11, to Install 12-volt receptacle connector.
Perform steps 6 through 11, to Install 24-volt receptacle connector.
Perform steps 1, 2, and 11, to Install voltage reducer.
Perform steps 3 through 6 and 11, to install circuit breakers and circuit breaker
mounting bracket.
NOTE
4-52
