TM 9-2330-390-14&P
4-34.
SIGNAL CONDITIONING BOX REPAIR.
This Task Covers:
a.
Disassembly
b. Assembly
Initial Setup:
Equipment Conditions:
Materials/Parts:
Signal conditioning box and forward junction box
Marker tags (Item 28, Appendix F)
removed (see paragraph 4-33).
Six lockwashers
Tools/Test Equipment:
General mechanics tool kit (Item 30, Appendix G)
NOTE
All wires should be tagged before removal. Refer to paragraph 4-18 for tagging
Instructlone.
Refer to electrical wiring diagrams for assiatance (see paragraph 4-50).
Perform steps 1 through 3, to remove 24-volt receptacle connector.
Perform steps 1, 2, and 4, to remove 12-volt receptacle connector.
Perform steps 1 and 5 through 8, to remove circuit breakers and circuit breaker
mounting bracket.
Perform steps 1, 9, and 10, to remove voltage reducer.
NOTE
4-49