TM 9-2330-390-14&P
2-16. DETACHING FRONT AND REAR DOLLIES FROM SHELTER (SHELTER ON
GROUND) (SIDE LIFT OPERATION) (Cont).
o.
At front and rear, install telescopic brace (30) to top beam (2) and drawbar (29) with two detent pins (28).
p.
Place each dolly half in maneuvering position (see paragraph 2-21b).
2-116